Skip to content
DelayAtlas

Carrier route record

MQCMH→DFW

Envoy Air · Columbus to Dallas-Fort Worth

Flights
311
Period
September 2025 to August 2026
Share of route
18%
Carriers
4
A+GRADE

Historical statistics for September 2025 to August 2026, not live status. For today’s flights, check with Envoy Air.

Envoy on CMH to DFW earns an A+. More than four flights in five arrive inside the 15-minute window the DOT uses to define an on-time arrival, which puts it 9 points better than the national rate of 77.3%. When something does go wrong the average delay runs a little over an hour. That rests on 311 flights, with a median arrival 14 minutes early.

Set against the rest of the country, Envoy's CMH to DFW record is 9 points better than the US average of 77.3%. That gap is worth roughly 94 fewer late arrivals for every thousand flights.

Key figures

On time

86.7%

Arrivals under 15 minutes late, of 309 completed flights

Avg delay

70 min

Across delayed arrivals only, not all flights

Cancelled

0.00%

National rate is 1.89%

Whole route

81.0%

Every carrier on CMH to DFW, 1,727 flights

These figures cover 311 flights between September 2025 and August 2026. The median arrival is 14 minutes early, which is the part an average hides: most flights here are fine, and the on-time rate is decided by a tail of badly late ones. On-time means under 15 minutes late, the DOT's own threshold.

Fare search by Aviasales, a Travelpayouts partner. Booking through it may earn this site a commission at no cost to you; it changes no figure here.

Carrier by carrier

Envoy against every carrier on CMH to DFW

Envoy flew 311 of the 1,727 flights on CMH to DFW, about 18% of it. Its 86.7% on time is 6 points better than the route as a whole, which runs 81.0%. Ranked by on-time rate it is number three of four carriers on the route, where the range runs from PSA at 100.0% to American at 79.6%. Two of those carriers flew fewer than 365 flights here, so treat their positions as rough.

Only one carrier clears this site's 365-flight floor here, so there is no comparison to draw. The table below is the full picture.

On-time performance by carrier on CMH to DFW
AirlineFlightsOn timeAvg delayCancelledGrade
PSA Airlinesthin sample3100.0%—0.00%A+
Delta Air Linesthin sample1100.0%—0.00%A+
Envoy Air (this page)thin sample31186.7%70 min0.00%A+
American Airlines1,41279.6%112 min2.48%B

Timetable by Aviasales, a Travelpayouts partner. Booking through it may earn this site a commission at no cost to you; it changes no figure here.

Departure window

When Envoy runs best on this route

Departure time is the single lever a traveller controls, and it moves the odds more than most people expect. Each bar below is the on-time rate for flights scheduled to leave inside that window, across 311 flights.

  • 5am–8am232 flights89.6%
  • 8am–11am15 flights—
  • 11am–2pm5 flights—
  • 2pm–5pm3 flights—
  • 5pm–8pm56 flights85.7%
  • 8pm–5am—

Scale runs 75% to 95%. Rows with fewer than 30 flights show a dash.

The 5am–8am window is the strongest at 89.6% on time. The full set of windows spans 4 points.

Across the year

Envoy on CMH to DFW through the year

  • Jul–Sep 202530 flights93.3%
  • Oct–Dec 2025158 flights84.2%
  • Jan–Mar 202619 flights—
  • Apr–Jun 202641 flights79.5%
  • Jul–Sep 202663 flights98.4%

Scale runs 70% to 100%. Rows with fewer than 30 flights show a dash.

Monthly volumes are too low here to break the year into twelve reliable readings. What the twelve-month total says is 86.7% on time across 311 flights.

Envoy on CMH to DFW did not run the same all year. Its best quarter was Jul–Sep 2026 at 98.4% on time and its weakest Apr–Jun 2026 at 79.5%, a swing of 19 points on roughly 78 flights a quarter. The twelve-month rate averages over that, so if you are flying in a weak quarter the quarter's own figure is the better guide.

Across the week, Friday is the strongest day at 95.0% on time and Saturday the weakest at 78.8%, a spread of 16 points.

On-time rate by day of the week82.9Mon88.4Tue88.1Wed89.7Thu95.0Fri78.8Sat89.5Sun
Monday: 82.9 percent on time. Tuesday: 88.4 percent on time. Wednesday: 88.1 percent on time. Thursday: 89.7 percent on time. Friday: 95.0 percent on time. Saturday: 78.8 percent on time. Sunday: 89.5 percent on time

Arrival by arrival

How late Envoy on CMH to DFW runs when it is late

Envoy on CMH to DFW often beats the schedule: 150 of 309 completed flights, 49%, arrived 15 minutes or more early. The 41 late arrivals split 18 under half an hour, 10 between 30 and 60 minutes, and 13 an hour or more.

  • 15+ min early150 flights48.5%
  • Within 15 min118 flights38.2%
  • 15–29 min late18 flights5.8%
  • 30–59 min late10 flights3.2%
  • 1–2 hours late7 flights2.3%
  • 2+ hours late6 flights1.9%

Scale runs 0% to 100%.

Share of 309 completed flights by arrival against schedule.

4 of 31 late departures made up the time and arrived on time, 13% of them. 14 flights left on time and still arrived late.

The worst days

Worst days for Envoy on CMH to DFW

The latest arrival of the period was on 10 January 2026, 9 hours 6 minutes behind schedule; most of its delay minutes were filed as a late-arriving aircraft. The same cause led on three of the five worst days.

The latest arrivals of Envoy on CMH to DFW in the period
DateArrived late byLargest filed cause
10 January 20269 hours 6 minutesLate-arriving aircraft
20 November 20254 hours 2 minutesLate-arriving aircraft
22 November 20252 hours 53 minutesCarrier
24 January 20262 hours 50 minutesExtreme weather
18 October 20252 hours 34 minutesLate-arriving aircraft

Delay causes

Why Envoy runs late on this route

Carriers report a reason for every delay minute they cause, in five DOT categories. The split below is by minutes, not by number of flights, so a handful of very long weather delays weighs as much as many short ones. It covers 2,868 reported delay minutes.

  • Late-arriving aircraft
    32%
  • Carrier
    31%
  • National Airspace System
    21%
  • Extreme weather
    16%
  • Security
    1%

Extreme weather accounts for 16% of delay minutes, well above the single-digit share typical across the system. Weather delays are lumpy: they arrive as whole bad days rather than as a steady drag, so the monthly strip above is the more useful view of the risk. The national share is 6%, so this operation carries roughly 2.6 times the usual weather exposure. The split is drawn from 2,868 reported delay minutes.

The practical consequence: the 5am–8am departure is the one that starts clean. Its aircraft has no earlier leg to be late from, which is exactly why that window shows 89.6% on time here.

Cancellations are rare at 0.00%, below the national 1.89% and low enough to earn the plus on the grade. Almost no flights are called off; the risk here is arriving late, not not arriving.

Connections and stage length

What a delay here costs

Badly late arrivals are rare here: only 4.2% land an hour or more behind schedule, against 8.3% nationally. Connections built on this flight are about as safe as US domestic connections get, though a cancelled flight still ignores every layover you give it.

The 926 miles between these two airports put this in the middle of the US network, around two and a half to three hours of block time. That is enough cruise to absorb a ten-minute late pushback and not enough to absorb thirty.

The return leg is a different operation and performs like one: it runs 76.7% on time across 310 flights, 10 points below this direction. Departure banks, aircraft rotations and the congestion at each end all differ, so scoring the two directions together would average away a real 10 points of difference.

One caution: this is a thin sample. 311 flights over twelve months is enough to clear this site's floor but not enough to pin the rate down tightly, and a single bad week moves it by more than a point. Treat the grade as a rough reading.

What to do with this

Booking Envoy on CMH to DFW

Put together: treat all of this as provisional. 311 flights over twelve months is enough to clear this site's floor and not enough to be confident to better than a couple of points. The 86.7% headline is the most reliable number on the page; the hour and month splits below it are built on a few dozen flights each. 309 completed flights over 12 months sit behind that.

Related

Where to go next

Source: US DOT Bureau of Transportation Statistics, on-time performance data, September 2025 to August 2026. Last updated ; recomputed monthly. How this data is collected.