Skip to content
DelayAtlas

Carrier route record

DLSLCPSC

Delta Air Lines · Salt Lake City to Pasco

Flights
348
Period
July 2025 to June 2026
Share of route
29%
Carriers
2
B+GRADE

Historical statistics for July 2025 to June 2026, not live status. For today’s flights, check with Delta Air Lines.

Delta on SLC to PSC earns a B+. More than four flights in five arrive inside the 15-minute window the DOT uses to define an on-time arrival, which puts it 7 points better than the national rate of 77.6%. When something does go wrong the average delay runs an hour and a half. That rests on 348 flights, with a median arrival 8 minutes early.

Set against the rest of the country, Delta's SLC to PSC record is 7 points better than the US average of 77.6%. That gap is worth roughly 70 fewer late arrivals for every thousand flights.

Key figures

On time

84.6%

Arrivals under 15 minutes late, of 344 completed flights

Avg delay

84 min

Across delayed arrivals only, not all flights

Cancelled

0.29%

National rate is 1.81%

Whole route

89.0%

Every carrier on SLC to PSC, 1,180 flights

These figures cover 348 flights between July 2025 and June 2026. The median arrival is 8 minutes early, which is the part an average hides: most flights here are fine, and the on-time rate is decided by a tail of badly late ones. On-time means under 15 minutes late, the DOT's own threshold.

Carrier by carrier

Delta against every carrier on SLC to PSC

Delta flew 348 of the 1,180 flights on SLC to PSC, about 29% of it. Its 84.6% on time is 4 points worse than the route as a whole, which runs 89.0%. Ranked by on-time rate it is last of two carriers on the route, where the range runs from SkyWest at 90.9% to Delta at 84.6%.

Only one carrier clears this site's 365-flight floor here, so there is no comparison to draw. The table below is the full picture.

On-time performance by carrier on SLC to PSC
AirlineFlightsOn timeAvg delayCancelledGrade
SkyWest Airlines83290.9%61 min0.12%A+
Delta Air Lines (this page)thin sample34884.6%84 min0.29%B+

Departure window

When Delta runs best on this route

Departure time is the single lever a traveller controls, and it moves the odds more than most people expect. Each bar below is the on-time rate for flights scheduled to leave inside that window, across 348 flights.

The overnight block holds up unusually well at 84.5% on time across 347 flights. Red-eyes fly into empty airspace and empty gates, and they are the first rotation of the aircraft's day rather than the last. The 8pm–5am window is the busiest, with 347 flights scheduled in it.

Across the year

Delta on SLC to PSC through the year

On-time rate by calendar monthJF90M93A74M80J71J74A90S87OND
Darker means more delays. Figures are on-time percentages.April best, July worst

July is the worst month at 71.0% on time, 22 points below April, the best at 93.3%. Summer afternoon convection and peak-season schedules land on the same weeks every year, so this is a pattern you can book around rather than a run of bad luck. March was the busiest month here, with 31 flights.

Across the week, Tuesday is the strongest day at 88.2% on time and Wednesday the weakest at 77.6%. 11 points is a smaller lever than departure hour, but it is free.

On-time rate by day of the week85.7Mon88.2Tue77.6Wed85.7Thu83.7Fri87.8Sat83.3Sun
Monday: 85.7 percent on time. Tuesday: 88.2 percent on time. Wednesday: 77.6 percent on time. Thursday: 85.7 percent on time. Friday: 83.7 percent on time. Saturday: 87.8 percent on time. Sunday: 83.3 percent on time

Delay causes

Why Delta runs late on this route

One category carries most of the weight here. Carrier accounts for 46% of the 4,435 delay minutes carriers reported, and the remaining four split what is left. The split is by minutes rather than by flights, so a few very long delays count for as much as many short ones.

  • Carrier
    46%
  • Extreme weather
    31%
  • Late-arriving aircraft
    16%
  • National Airspace System
    7%

Extreme weather accounts for 31% of delay minutes, well above the single-digit share typical across the system. Weather delays are lumpy: they arrive as whole bad days rather than as a steady drag, so the monthly strip above is the more useful view of the risk. The national share is 6%, so this operation carries roughly 5.0 times the usual weather exposure. The split is drawn from 4,435 reported delay minutes.

The largest share of delay minutes, 46%, falls under carrier control: crew scheduling, maintenance, fuelling, baggage. Unlike weather, that is a management outcome, and it is the category where the gap between two carriers on the same schedule is genuinely earned. It accounts for 2,024 of the 4,435 delay minutes reported here.

Cancellations are rare at 0.29%, below the national 1.81% and low enough to earn the plus on the grade. Roughly one flight in 100 is called off; the risk here is arriving late, not not arriving.

Connections and stage length

What a delay here costs

6.4% of arrivals land an hour or more late, close to the national 8.1%. That is the figure that decides a connection, and it says a 60 to 75 minute layover is reasonable here while anything under 45 minutes is a bet. Most delays on this route last an hour and a half, which a normal layover absorbs.

The 521 miles between these two airports put this in the middle of the US network, around two and a half to three hours of block time. That is enough cruise to absorb a ten-minute late pushback and not enough to absorb thirty. It is also long enough that the aircraft usually flies three or four legs a day rather than six, which slows how fast delay compounds.

The return leg is a different operation and performs like one: it runs 95.1% on time across 349 flights, 11 points above this direction. Departure banks, aircraft rotations and the congestion at each end all differ, so scoring the two directions together would average away a real 11 points of difference.

One caution: this is a thin sample. 348 flights over twelve months is enough to clear this site's floor but not enough to pin the rate down tightly, and a single bad week moves it by more than a point. Treat the grade as a rough reading.

What to do with this

Booking Delta on SLC to PSC

Put together: treat all of this as provisional. 348 flights over twelve months is enough to clear this site's floor and not enough to be confident to better than a couple of points. The 84.6% headline is the most reliable number on the page; the hour and month splits below it are built on a few dozen flights each. 344 completed flights over 12 months sit behind that.

Related

Where to go next

Source: US DOT Bureau of Transportation Statistics, on-time performance data, July 2025 to June 2026. Last updated 15 September 2026; recomputed monthly. How this data is collected.