Skip to content
DelayAtlas

Carrier route record

OOOMA→DEN

SkyWest Airlines · Omaha to Denver

Flights
425
Period
September 2025 to August 2026
Share of route
13%
Carriers
4
A+GRADE

Historical statistics for September 2025 to August 2026, not live status. For today’s flights, check with SkyWest Airlines.

SkyWest on OMA to DEN earns an A+. More than four flights in five arrive inside the 15-minute window the DOT uses to define an on-time arrival, which puts it 8 points better than the national rate of 77.3%. When something does go wrong the average delay runs a little over an hour. That rests on 425 flights. The strongest carrier on the route with a full sample, United Airlines, flew 1,284 at 78.2% on time.

Set against the rest of the country, SkyWest's OMA to DEN record is 8 points better than the US average of 77.3%. That gap is worth roughly 77 fewer late arrivals for every thousand flights.

Key figures

On time

85.0%

Arrivals under 15 minutes late, of 420 completed flights

Avg delay

80 min

Across delayed arrivals only, not all flights

Cancelled

0.71%

National rate is 1.89%

Whole route

75.8%

Every carrier on OMA to DEN, 3,325 flights

These figures cover 425 flights between September 2025 and August 2026. The median arrival is 15 minutes early, which is the part an average hides: most flights here are fine, and the on-time rate is decided by a tail of badly late ones. On-time means under 15 minutes late, the DOT's own threshold.

Fare search by Aviasales, a Travelpayouts partner. Booking through it may earn this site a commission at no cost to you; it changes no figure here.

Carrier by carrier

SkyWest against every carrier on OMA to DEN

SkyWest flew 425 of the 3,325 flights on OMA to DEN, about 13% of it. Its 85.0% on time is 9 points better than the route as a whole, which runs 75.8%. Ranked by on-time rate it is first of four carriers on the route, where the range runs from SkyWest at 85.0% to Frontier at 69.7%. One of those carriers flew fewer than 365 flights here, so treat their positions as rough.

The choice of carrier is not cosmetic here. United Airlines arrives on time 78.2% of the time; Southwest Airlines manages 71.8%. Sample sizes sit next to every figure, because a two-point gap across 1,384 flights means less than a ten-point one.

On-time performance by carrier on OMA to DEN
AirlineFlightsOn timeAvg delayCancelledGrade
SkyWest Airlines (this page)42585.0%80 min0.71%A+
United Airlines1,28478.2%74 min0.47%B+
Southwest Airlines1,38471.8%62 min0.51%C+
Frontier Airlinesthin sample23269.7%119 min0.43%C+

United leads Southwest by 6 points. Real, but small enough that a better departure time on the weaker carrier can outweigh it.

Timetable by Aviasales, a Travelpayouts partner. Booking through it may earn this site a commission at no cost to you; it changes no figure here.

Departure window

When SkyWest runs best on this route

Departure time matters more here than the choice of carrier. The gap between the best and worst window is 42 points, against 6 points between the best and worst carrier.

  • 5am–8am150 flights90.5%
  • 8am–11am—
  • 11am–2pm178 flights94.4%
  • 2pm–5pm22 flights—
  • 5pm–8pm75 flights52.7%
  • 8pm–5am—

Scale runs 45% to 100%. Rows with fewer than 30 flights show a dash.

The 5pm–8pm window is where this operation falls apart: 52.7% on time, against 94.4% for the 11am–2pm slot. By evening the aircraft flying these rotations have absorbed a full day of small delays and there is no slack left to recover in. The 11am–2pm window is the busiest, with 178 flights scheduled in it.

Across the year

SkyWest on OMA to DEN through the year

On-time rate by calendar month91J—F—M91A87M72J76J72A—S—O96N77D
Darker means more delays. Figures are on-time percentages.November best, June worst

August is the worst month at 72.3% on time, 23 points below November, the best at 95.6%. Summer afternoon convection and peak-season schedules land on the same weeks every year, so this is a pattern you can book around rather than a run of bad luck. July was the busiest month here, with 49 flights.

Across the week, Tuesday is the strongest day at 90.4% on time and Monday the weakest at 77.5%, a spread of 13 points.

On-time rate by day of the week77.5Mon90.4Tue84.8Wed82.9Thu90.0Fri—Sat83.1Sun
Monday: 77.5 percent on time. Tuesday: 90.4 percent on time. Wednesday: 84.8 percent on time. Thursday: 82.9 percent on time. Friday: 90.0 percent on time. Saturday: not enough flights. Sunday: 83.1 percent on time

Arrival by arrival

How late SkyWest on OMA to DEN runs when it is late

SkyWest on OMA to DEN often beats the schedule: 219 of 420 completed flights, 52%, arrived 15 minutes or more early. The 63 late arrivals split 18 under half an hour, 17 between 30 and 60 minutes, and 28 an hour or more.

  • 15+ min early219 flights52.1%
  • Within 15 min138 flights32.9%
  • 15–29 min late18 flights4.3%
  • 30–59 min late17 flights4.0%
  • 1–2 hours late17 flights4.0%
  • 2+ hours late11 flights2.6%

Scale runs 0% to 100%.

Share of 420 completed flights by arrival against schedule.

Time lost at the gate mostly stays lost. Of 55 departures that left 15 minutes late or more, only 6 made it up before arrival. 14 flights left on time and still arrived late.

The worst days

Worst days for SkyWest on OMA to DEN

The latest arrival of the period was on 19 December 2025, 6 hours 42 minutes behind schedule; most of its delay minutes were filed as a late-arriving aircraft. On three of the five worst days the largest share was filed as carrier-caused (crew, maintenance, fuelling, baggage).

The latest arrivals of SkyWest on OMA to DEN in the period
DateArrived late byLargest filed cause
19 December 20256 hours 42 minutesLate-arriving aircraft
30 December 20256 hours 3 minutesCarrier
30 November 20254 hours 30 minutesLate-arriving aircraft
30 November 20254 hours 17 minutesCarrier
1 March 20263 hours 56 minutesCarrier

Delay causes

Why SkyWest runs late on this route

Carriers report a reason for every delay minute they cause, in five DOT categories. The split below is by minutes, not by number of flights, so a handful of very long weather delays weighs as much as many short ones. It covers 5,017 reported delay minutes.

  • Carrier
    38%
  • National Airspace System
    26%
  • Late-arriving aircraft
    25%
  • Extreme weather
    11%

The largest share of delay minutes, 38%, falls under carrier control: crew scheduling, maintenance, fuelling, baggage. It accounts for 1,914 of the 5,017 delay minutes reported here. The split is drawn from 5,017 reported delay minutes.

Cancellations are rare at 0.71%, below the national 1.89% and low enough to earn the plus on the grade. Roughly one flight in 100 is called off; the risk here is arriving late, not not arriving.

Connections and stage length

What a delay here costs

6.7% of arrivals land an hour or more late, close to the national 8.3%, so a 60 to 75 minute layover is reasonable here while anything under 45 minutes is a bet. Most delays on this route last a little over an hour, which a normal layover absorbs.

At 472 miles this is a short hop, and stage length matters more than it looks. A flight this short spends under two hours in the air, which leaves almost nothing to claw back a late pushback with. Delay here is decided on the ground, in the turn, which is why the 11am–2pm window matters as much as it does.

The return leg is a different operation and performs like one: it runs 88.4% on time across 424 flights, 3 points above this direction. Departure banks, aircraft rotations and the congestion at each end all differ, so scoring the two directions together would average away a real 3 points of difference.

One caution: this is a thin sample. 425 flights over twelve months is enough to clear this site's floor but not enough to pin the rate down tightly, and a single bad week moves it by more than a point. Treat the grade as a rough reading.

What to do with this

Booking SkyWest on OMA to DEN

Put together: treat all of this as provisional. 425 flights over twelve months is enough to clear this site's floor and not enough to be confident to better than a couple of points. The 85.0% headline is the most reliable number on the page; the hour and month splits below it are built on a few dozen flights each. 420 completed flights over 12 months sit behind that.

Related

Where to go next

Source: US DOT Bureau of Transportation Statistics, on-time performance data, September 2025 to August 2026. Last updated ; recomputed monthly. How this data is collected.