Carrier route record
OOORD→MKE
SkyWest Airlines · Chicago to Milwaukee
- Flights
- 4,933
- Period
- July 2025 to June 2026
- Share of route
- 95%
- Carriers
- 4
Historical statistics for July 2025 to June 2026, not live status. For today’s flights, check with SkyWest Airlines.
SkyWest on ORD to MKE carries a cancellation problem, not just a delay problem: 4.6% of scheduled flights never operate, against 1.8% nationally. Of the ones that do fly, about two flights in three arrive on time, worth a D− overall. The punctuality figure counts only flights that actually departed, so it flatters an operation that cancels this often. That rests on 4,933 flights, with a median arrival 1 minute late.
The national on-time rate over the same period is 77.6%, so SkyWest on ORD to MKE runs 14 points behind the country as a whole. Across a thousand flights that is about 139 extra late arrivals.
Key figures
On time
63.7%
Arrivals under 15 minutes late, of 4,698 completed flights
Avg delay
93 min
Across delayed arrivals only, not all flights
Cancelled
4.64%
National rate is 1.81%
Whole route
64.1%
Every carrier on ORD to MKE, 5,201 flights
These figures cover 4,933 flights between July 2025 and June 2026. Beyond the headline rate, 17.6% of arrivals land a full hour or more behind schedule. That is the number that wrecks a connection, and it is not visible in an on-time percentage alone.
Carrier by carrier
SkyWest against every carrier on ORD to MKE
SkyWest flew 4,933 of the 5,201 flights on ORD to MKE, most of the route. Its 63.7% on time is about level with the route as a whole at 64.1%. Ranked by on-time rate it is number three of four carriers on the route, where the range runs from Republic at 78.8% to Envoy at 63.7%. Three of those carriers flew fewer than 365 flights here, so treat their positions as rough.
Only one carrier clears this site's 365-flight floor here, so there is no comparison to draw. The table below is the full picture.
| Airline | Flights | On time | Avg delay | Cancelled | Grade |
|---|---|---|---|---|---|
| Republic Airwaysthin sample | 112 | 78.8% | 77 min | 7.14% | B− |
| PSA Airlinesthin sample | 26 | 72.7% | 312 min | 15.38% | C− |
| SkyWest Airlines (this page) | 4,933 | 63.7% | 93 min | 4.64% | D− |
| Envoy Airthin sample | 130 | 63.7% | 67 min | 4.62% | D− |
Flight by flight
SkyWest flight numbers on ORD to MKE
Departure window
When SkyWest runs best on this route
Departure time matters more here than the choice of carrier. The gap between the best and worst window is 20 points, against half a point between the best and worst carrier. Each bar is the on-time rate for flights scheduled inside that window.
- 5am–8am180 flights76.0%
- 8am–11am829 flights72.3%
- 11am–2pm611 flights66.6%
- 2pm–5pm845 flights61.2%
- 5pm–8pm1,276 flights55.7%
- 8pm–5am1,192 flights64.6%
Scale runs 45% to 80%. Rows with fewer than 30 flights show a dash.
The 5pm–8pm window is where this operation falls apart: 55.7% on time, against 76.0% for the 5am–8am slot. By evening the aircraft flying these rotations have absorbed a full day of small delays and there is no slack left to recover in. The 5pm–8pm window is the busiest, with 1,276 flights scheduled in it.
Across the year
SkyWest on ORD to MKE through the year
December is the weak month at 52.3% on time, against 73.3% in September. Winter delays cluster: a single storm system can account for most of a month's shortfall, so an average December hides both very good weeks and genuinely unflyable days. May was the busiest month here, with 512 flights.
Across the week, Tuesday is the strongest day at 70.0% on time and Sunday the weakest at 57.0%. 13 points is a smaller lever than departure hour, but it is free.
Delay causes
Why SkyWest runs late on this route
Carriers report a reason for every delay minute they cause, in five DOT categories. The split below is by minutes, not by number of flights, so a handful of very long weather delays weighs as much as many short ones. It covers 158,000 reported delay minutes.
- 39%Carrier
- 27%Late-arriving aircraft
- 17%Extreme weather
- 16%National Airspace System
Extreme weather accounts for 17% of delay minutes, well above the single-digit share typical across the system. Weather delays are lumpy: they arrive as whole bad days rather than as a steady drag, so the monthly strip above is the more useful view of the risk. The national share is 6%, so this operation carries roughly 2.7 times the usual weather exposure. The split is drawn from 158,272 reported delay minutes.
The largest share of delay minutes, 39%, falls under carrier control: crew scheduling, maintenance, fuelling, baggage. Unlike weather, that is a management outcome, and it is the category where the gap between two carriers on the same schedule is genuinely earned. It accounts for 62,000 of the 158,000 delay minutes reported here.
Cancellations run at 4.64%, against 1.81% nationally. That is about one flight in twenty cancelled outright. A cancelled flight is invisible in every on-time figure on this page, so the punctuality numbers above describe only the flights that actually operated.
Connections and stage length
What a delay here costs
For anyone connecting, the number to weigh is not the on-time rate but the tail behind it. 17.6% of arrivals land a full hour or more behind schedule, against 8.1% nationally. A 45-minute layover does not survive that, and no amount of walking quickly changes it. Ninety minutes is the honest minimum here, and two hours if the onward flight is on a separate ticket.
At 67 miles this is a short hop, and stage length matters more than it looks. A flight this short spends under two hours in the air, which leaves almost nothing to claw back a late pushback with. Delay here is decided on the ground, in the turn, which is why the 5am–8am window matters as much as it does.
The return leg is a different operation and performs like one: it runs 67.3% on time across 4,932 flights, 4 points above this direction. Departure banks, aircraft rotations and the congestion at each end all differ, so scoring the two directions together would average away a real 4 points of difference.
The sample behind these figures is 4,933 flights, enough that the headline rate is stable to within roughly a point. The hour-block and month splits divide that further, so read the thinner bars with more caution than the headline.
What to do with this
Booking SkyWest on ORD to MKE
Put together: the delay figures matter less here than the 4.64% cancellation rate. A late arrival costs you an hour and a half; a cancelled flight costs you the day. Book the 5am–8am departure so there is still a schedule behind you if it goes wrong, and treat a same-day connection as optimistic. 4,698 completed flights over 12 months sit behind that.
Related
Where to go next
- ORD to MKE, every carrier
- SkyWest on MKE to ORD, the return leg
- Republic Airways on ORD to MKE78.8%
- Envoy Air on ORD to MKE63.7%
- SkyWest Airlines network-wide record
- Chicago O'Hare International (ORD) delay statistics
- The US routes with the most cancellations
- The best time of day to fly, according to 7.04 million flight records
Source: US DOT Bureau of Transportation Statistics, on-time performance data, July 2025 to June 2026. Last updated 15 September 2026; recomputed monthly. How this data is collected.