Skip to content
DelayAtlas

Carrier route record

OOLGAPIT

SkyWest Airlines · New York to Pittsburgh

Flights
150
Period
July 2025 to June 2026
Share of route
5%
Carriers
2
CGRADE

Historical statistics for July 2025 to June 2026, not live status. For today’s flights, check with SkyWest Airlines.

SkyWest on LGA to PIT sits in the middle of the pack with a C. About seven flights in ten arrive on time by the DOT's definition, 6 points worse than the national rate of 77.6%. The late ones land a little over an hour behind schedule. That rests on 150 flights, with a median arrival 2 minutes early.

The national on-time rate over the same period is 77.6%, so SkyWest on LGA to PIT runs 6 points behind the country as a whole. Across a thousand flights that is about 64 extra late arrivals.

Key figures

On time

71.2%

Arrivals under 15 minutes late, of 146 completed flights

Avg delay

79 min

Across delayed arrivals only, not all flights

Cancelled

2.67%

National rate is 1.81%

Whole route

79.0%

Every carrier on LGA to PIT, 3,013 flights

These figures cover 150 flights between July 2025 and June 2026. Beyond the headline rate, 8.2% of arrivals land a full hour or more behind schedule. That is the number that wrecks a connection, and it is not visible in an on-time percentage alone.

Carrier by carrier

SkyWest against every carrier on LGA to PIT

SkyWest flew 150 of the 3,013 flights on LGA to PIT, about 5% of it. Its 71.2% on time is 8 points worse than the route as a whole, which runs 79.0%. Ranked by on-time rate it is last of two carriers on the route, where the range runs from Republic at 79.4% to SkyWest at 71.2%.

Only one carrier clears this site's 365-flight floor here, so there is no comparison to draw. The table below is the full picture.

On-time performance by carrier on LGA to PIT
AirlineFlightsOn timeAvg delayCancelledGrade
Republic Airways2,86379.4%75 min4.54%B−
SkyWest Airlines (this page)thin sample15071.2%79 min2.67%C

Departure window

When SkyWest runs best on this route

Departure time is the single lever a traveller controls, and it moves the odds more than most people expect. Each bar below is the on-time rate for flights scheduled to leave inside that window, across 150 flights.

  • 5am–8am
  • 8am–11am
  • 11am–2pm92 flights71.7%
  • 2pm–5pm58 flights70.4%
  • 5pm–8pm
  • 8pm–5am

Scale runs 60% to 75%. Rows with fewer than 30 flights show a dash.

The 11am–2pm window is the strongest at 71.7% on time. The full set of windows spans about a point.

Across the year

SkyWest on LGA to PIT through the year

  • Jul–Sep 202581 flights75.3%
  • Oct–Dec 202569 flights66.7%

Scale runs 60% to 80%. Rows with fewer than 30 flights show a dash.

Monthly volumes are too low here to break the year into twelve reliable readings. What the twelve-month total says is 71.2% on time across 150 flights.

Split by quarter, SkyWest on LGA to PIT logged 81 flights in Jul–Sep 2025 and 69 flights in Oct–Dec 2025. Fewer than three of those quarters carried the 30 completed flights this site needs before printing a rate, so the 71.2% annual figure is the one to use.

Delay causes

Why SkyWest runs late on this route

One category carries most of the weight here. Carrier accounts for 67% of the 3,298 delay minutes carriers reported, and the remaining four split what is left. The split is by minutes rather than by flights, so a few very long delays count for as much as many short ones.

  • Carrier
    67%
  • National Airspace System
    20%
  • Extreme weather
    13%

Extreme weather accounts for 13% of delay minutes, well above the single-digit share typical across the system. Weather delays are lumpy: they arrive as whole bad days rather than as a steady drag, so the monthly strip above is the more useful view of the risk. The national share is 6%, so this operation carries roughly 2.0 times the usual weather exposure. The split is drawn from 3,298 reported delay minutes.

The largest share of delay minutes, 67%, falls under carrier control: crew scheduling, maintenance, fuelling, baggage. Unlike weather, that is a management outcome, and it is the category where the gap between two carriers on the same schedule is genuinely earned. It accounts for 2,218 of the 3,298 delay minutes reported here.

Cancellations run at 2.67%, against 1.81% nationally. That is about one flight in 40 cancelled outright. A cancelled flight is invisible in every on-time figure on this page, so the punctuality numbers above describe only the flights that actually operated.

Connections and stage length

What a delay here costs

8.2% of arrivals land an hour or more late, close to the national 8.1%. That is the figure that decides a connection, and it says a 60 to 75 minute layover is reasonable here while anything under 45 minutes is a bet. Most delays on this route last a little over an hour, which a normal layover absorbs.

At 335 miles this is a short hop, and stage length matters more than it looks. A flight this short spends under two hours in the air, which leaves almost nothing to claw back a late pushback with. Delay here is decided on the ground, in the turn, which is why the 11am–2pm window matters as much as it does.

The return leg is a different operation and performs like one: it runs 66.2% on time across 150 flights, 5 points below this direction. Departure banks, aircraft rotations and the congestion at each end all differ, so scoring the two directions together would average away a real 5 points of difference.

One caution: this is a thin sample. 150 flights over twelve months is enough to clear this site's floor but not enough to pin the rate down tightly, and a single bad week moves it by more than a point. Treat the grade as a rough reading.

What to do with this

Booking SkyWest on LGA to PIT

Put together: treat all of this as provisional. 150 flights over twelve months is enough to clear this site's floor and not enough to be confident to better than a couple of points. The 71.2% headline is the most reliable number on the page; the hour and month splits below it are built on a few dozen flights each. 146 completed flights over 12 months sit behind that.

Related

Where to go next

Source: US DOT Bureau of Transportation Statistics, on-time performance data, July 2025 to June 2026. Last updated 15 September 2026; recomputed monthly. How this data is collected.